Smart Business

How to Write a Quote for a Job: Steps and Checklist

What to put on the page, how to work out the price, a worked example in US dollars and follow-up scripts you can copy.

How to Write a Quote for a Job: Steps and Checklist
Quick answer

How to write a quote for a job: put your business details and licence number, the customer's details, a quote number and date at the top. Then describe the scope of work, itemise materials and labour, add any sales tax, show the total, and set the start date, payment terms, exclusions and how long the price is valid.

This guide is about a price quote for a trade or service job. It does not cover quoting a source in an essay. If you searched how to write a quote because a customer is waiting on a price, you are in the right place.

A good quote tells the customer what you will do, what it costs, when it happens and what the price leaves out. Below you will find a checklist, the steps, a way to work out the price, a worked example in US dollars and follow-up scripts.


Quote, estimate or bid: which are you writing?

A quote is a fixed price for a defined job. If the customer accepts it and the work matches the scope, that is the price they pay. An estimate is your best guess at the cost, and the final bill can move if you find more once the job starts. A bid is usually a quote you submit against other contractors, often on a set form for a builder or a commercial client.

The label at the top of the page matters less than the wording underneath it. Whether a price is fixed or open to change depends on what your document says and on your state's law. If the price can move, say so plainly, explain what would move it, and say how you will tell the customer before it does. If the price is fixed, say that too, along with what it does not cover.

Most small jobs suit a fixed quote. Jobs with unknowns behind walls, under floors or in the ground often suit an estimate with a clear allowance, or a fixed quote with written exclusions.

What to include in a job quote: the checklist

The FTC's home improvement advice tells homeowners that a written estimate should describe the work, the materials, the completion date and the price. For the contract a customer signs, it also lists the contractor's name, address, phone number and licence number, plus estimated start and completion dates. Customers who read that advice will check your quote against it, so build yours to match.

  • Your business name, address, phone number, email and licence number
  • The customer's name, job address, phone number and email
  • A unique quote number and the date you issued it
  • A scope of work: what you will do, where, and to what standard
  • Itemised materials, with brand, model or grade where it matters
  • Labour, shown as one line or as hours and a rate
  • Other charges such as permits, disposal, equipment hire or a trip charge
  • Subtotal, sales tax where it applies, and the total
  • Exclusions: what the price does not cover
  • Estimated start and completion dates
  • Deposit and payment terms
  • How long the quote is valid
  • How to accept: a signature line, a reply or an online approval
  • How changes are handled once work begins

How to write a quote, step by step

Write the quote the same day you see the job, while the measurements and photos are fresh. These seven steps work for a one-page faucet replacement or a three-page deck build.

1. Start from a template

Set up one template and use it for every quote. A word processor, a spreadsheet or quoting software all work. What matters is that your logo, contact details, licence number and standard terms are already in place, so each new quote means filling in the job details and nothing else.

2. Add your details and the customer's

Put your business details at the top: trading name, address, phone, email, website and licence number. The SBA's guide to licences and permits explains that requirements depend on what your business does and vary by state, county and city, with construction among the commonly regulated activities. Show the number your licensing body issued for the place you are working. Below that, add the customer's name, the job address (which may differ from the billing address), phone and email.

3. Number and date it

Give each quote a unique number that runs in order, such as Q-1043, and the date issued. A number lets you and the customer talk about the same version. If you revise the quote, issue it as Q-1043-2 so nobody signs an old price by mistake.

4. Write the scope of work

This is the part customers read most closely, and the part that saves arguments later. Describe the job in plain words, room by room or stage by stage. Say what you will remove, what you will install, what finish they will get and who cleans up.

"Replace kitchen faucet" is thin. "Remove existing kitchen faucet, supply and install a single-handle pull-down faucet (brand and model), connect to existing shutoff valves, test for leaks, take the old faucet away" leaves little room for a dispute.

Then write the exclusions. Common ones are patching and painting after access holes, moving furniture, permit fees if the customer pulls the permit, and anything hidden that you could not inspect. If you might find rot, mould or damaged wiring, say how you will handle it: stop, show the customer, and price the extra work in writing before you start it.

5. Itemise the price

Break the price into lines the customer can follow: materials, labour, other charges, subtotal, tax and total. You do not have to show your markup or your hourly rate, but show enough that the customer can see what they are paying for. The FTC tells homeowners not to pick the lowest bidder automatically and to ask about big differences among estimates, so a quote that explains what drives its price stands up better next to a cheaper one.

Where the job allows it, offer good, better and best options, such as a standard fixture, a mid-range one and a premium one. Options give the customer a choice inside your quote instead of a choice between you and another contractor.

6. Set your terms

Write the terms in short, plain lines:

  • Validity: how long the price holds. Pick a period that matches how fast your supplier prices move, such as 14 or 30 days.
  • Deposit: how much and when. Some states limit the down payment a contractor can ask for, so check your state's rule before you fill in this line.
  • Payment: when the balance is due, how the customer can pay, and any progress payments tied to stages of the work.
  • Changes: any change to the scope needs a written change order with the new price, signed before the extra work starts.
  • Timing: estimated start and completion dates, and what can delay them, such as weather or late materials.

7. Send it and make acceptance easy

Email a PDF or send a link the customer can approve online, then text them to say it has arrived. For bigger jobs, walk them through it in person or by phone. End the quote with one clear way to accept: sign and return, reply "approved", or click accept. Note the date you sent it so you know when to follow up.

How to price a job before you write the quote

The layout is the easy part. The price is where you win the job or lose your profit on it. Work it out in this order:

  1. Labour hours. Break the job into tasks and estimate the hours for each, including setup, cleanup and any second visit. Multiply by the number of people on the job.
  2. Labour rate. Your rate has to cover wages or your own pay, payroll costs, insurance, vehicle costs and the time you spend on admin. If you are unsure of your rate, add up a year of business costs, divide by the hours you can bill, then add your margin.
  3. Materials. Price each item from your supplier at current cost, add an allowance for waste and offcuts, then add a markup for the time spent ordering, collecting and handling them.
  4. Other costs. Permits, dump fees, equipment hire, travel to a distant job and any subcontractors.
  5. Risk. Old houses, tight access and unknowns behind walls take longer. Price that risk in, or exclude it and quote it separately if you find it.
  6. Margin. Overhead keeps the business running, and margin is the profit on top. Keep the two separate so you know what each job earns.

Check the price against similar past jobs before you send it. If you track the hours each job took against the hours you quoted, after a few months you will see which kinds of work you underprice.

Worked example: a quote for painting a bedroom

Here is how a simple quote for a US customer might look. The rates, markup and tax rate below are assumptions for this example, not figures to copy. Use your own numbers and your state's tax rules.

Quote Q-1043, issued November 19, 2026, valid for 30 days.

Scope: Paint the walls and ceiling of a 12 by 14 foot bedroom. Patch nail holes and minor cracks, prime the patched areas, apply two coats of wall paint in the customer's chosen colour and two coats of ceiling white. Cover floors and furniture, remove masking and clean up each day. Excludes trim, doors, wallpaper removal and repairs to damaged drywall beyond minor patching.

  • Labour: 2 painters for 8 hours, 16 hours at $55 per hour: $880
  • Paint, primer, patching compound, tape and drop cloths: $252 (supplier cost of $210 plus a 20% markup)
  • Trip and setup charge: $40
  • Subtotal: $1,172
  • Sales tax on materials at an assumed 6%: $15.12
  • Total: $1,187.12
  • Deposit: $300 on acceptance, balance due on completion (after checking the state's limit on deposits)
  • Estimated start: within 10 business days of acceptance, with 2 days on site

In this example, the state taxes the materials but not the painting labour. Your state may treat it the other way round.

US rules to check before you send a quote

A few rules change what goes on your quote. Check each one for the state, and sometimes the county or city, where you work.

  • Licence number. Show the number your licensing body requires and check its rules on where it must appear on quotes, contracts and ads.
  • Deposit cap. If your state caps down payments, set your standard deposit line below that cap so you do not have to rewrite it on each quote.
  • Right to cancel. If the customer signs at their home or away from your permanent place of business, the FTC Cooling-Off Rule covers door-to-door sales above $25 and requires you to tell them they can cancel within three business days. If your quote doubles as the contract they sign at the kitchen table, add that written notice.
  • Sales tax. Whether you charge it on materials, labour or both depends on your state and the type of contract. Ask your state department of revenue before you set up your template.

How to follow up on a quote

Plenty of quotes go quiet because the customer is busy, comparing prices or waiting to talk it over at home, not because the answer is no. A short, polite follow-up gives them an easy way to say yes. A simple schedule:

  1. Same day: send the quote and a text saying it is in their inbox.
  2. Two to three days later: call or text to ask if they have questions.
  3. About a week later: check in again with one useful detail, such as your next open start date.
  4. A few days before it expires: remind them of the expiry date.
  5. After it expires: send a short note offering to re-quote if they still need the work.

Scripts you can adapt:

  • "Hi Sam, it's Alex from Northside Painting. Checking you got quote Q-1043 for the bedroom. Happy to go through any of it by phone."
  • "Hi Sam, we have a start date open on the 3rd if you would like to go ahead. Quote Q-1043 is valid until the 19th."
  • "Hi Sam, your quote expired last week. If the job is still on, reply here and I will check the prices and resend it."

Speed matters before the quote too. For most trade and service businesses, a quote starts with a phone call, and a call that goes to voicemail while you are up a ladder may never become a site visit. Replying fast to new enquiries is often called speed to lead. Sophiie is an AI receptionist for tradies and service businesses that picks up, qualifies and books the caller. If you want help turning job details into a written price, read how AI quoting for trade jobs works.

Conclusion

Write the quote on the day you see the job, from a template that already holds your details and standard terms. Spend most of your time on the scope, the exclusions and the price, because those are the lines customers question.

Before you send it, check your state's rules on licence numbers, deposits, sales tax and the right to cancel. Then follow up on a set schedule until the customer gives you a yes, a no or a date to call back.

More news

The latest industry news, interviews, technologies, and resources.

View all posts

Ready to automate your back office?

Sophiie answers, books, quotes, invoices and follows up, so you stay on the tools.